Do you have these concerns?
- We are considering building a new cosmetics factory; in such case, we are unsure where to start.
- We are uncertain about how to implement cosmetics GMP.
- We want to know the rough construction costs for building a cosmetics factory.
- We are looking to reduce construction costs.
Please contact CM Plus
- We will listen to your as-yet-unformed requirements and compile them into a document called URB (User Requirement Brief). The URB clarifies vague requirements, and it serves as the foundation for advancing the construction plan.
- We can advise on how much of the industry standard cosmetics GMP, ISO 22716, should be incorporated. Based on our extensive experience in applying pharmaceutical GMP to pharmaceutical factories, CM Plus will provide appropriate advice that captures the essence of GMP.
- At the end of the basic planning and basic design phases, we will present you with the approximate construction costs.
- Upon completion of the basic design, we recommend requesting quotations from multiple construction companies.
Advantage of CM Plus
Facility Planning Focused on Production Equipment
CM Plus not only has first-class architects but also a wide range of specialized engineers including process engineers, mechanical engineers, electrical and instrumentation engineers, and HVAC engineers. Additionally, we have numerous project managers with extensive experience in project execution. This enables us to support not only building construction but also internal equipment layout and procurement of cosmetics manufacturing equipment.
Compliance with Regulations and Guidelines
CM Plus have a wealth of consultants and engineers who are thoroughly familiar with GMP for pharmaceutical factories, enabling us to provide advice on the application of cosmetics GMP to our clients.
Estimation of Costs at the Basic Planning
At the end of the basic planning phase, we use CM Plus’ construction cost databank to present approximate construction costs, adjusted for past project costs and inflation rates. Furthermore, at the end of the basic design phase, we present an estimated construction cost that includes detailed breakdowns.
Project Management Capability
We have numerous project managers with extensive experience in various projects, ensuring that projects are executed as planned with regard to schedule, cost, and quality assurance.
Cost Management
Our experienced project managers and specialized engineers appropriately manage construction costs and report to our clients.
Construction Project Flow of the Production Facilities
We will explain in detail the workflow for each project phase.
Project Cases
We will introduce only the keywords. For details, please contact us.
CM Method in Cosmetics Factory Construction
New Cosmetics Factory Construction Projects
- “Good-looking” Cosmetics Factory (Exterior + Visitor Pathway)
- Clean Exterior to Attract Employees
- Application of Cosmetic GMP ISO 22716 (Industry Standard)
- Installation of Clean Rooms
- Competitive Bidding
- Clothing Change Plan
- Zoning Plan
- Workflow Plan
- Investment Cost
- Cost Transparency
- Evaluation of the Reasonableness of Construction Costs for Additional / Change Requests
A Existing Machinery Plant into a Cosmetics Factory
- Existing Room Layout
- Limited Installation Area
- Zoning and Workflow Plans
- Effective Utilization of Existing Equipment
- Close Communication Among Clients, Contractors, Us, and Production Machinery Vendors
- Setting the Scope of Modifications in Existing Buildings and Equipment
- Utilization of Existing Ducts/Wiring Routes