Do you have these concerns?
- We are considering building a new home care production plant; in such case, we are unsure where to start.
- We are struggling with the production line layout.
- We quickly need to grasp the construction costs.
- We want to proceed with the design phase separately from the construction work to maintain transparency, although the request of design to construction companies means including the construction phase.
Please contact CM Plus
- We support your project from the investment planning and business concept stages.
- We will materialize your ideas for building a new factory together with you.
For example, we create production layouts that optimize material flow and human flow according to your requirements. If you provide the specifications and dimensions of individual equipment, we can also conduct layout planning in 3D using BIM. - We will present the estimated construction costs at the end of both the basic planning and basic design phases.
- CM Plus has engineers with extensive experience who will promptly carry out basic planning and design.
After completing the basic design, we can also create inquiry documents for construction bids and make a bidding to the construction companies with a Design-Build approach.
Advantage of CM Plus
Facility Planning Focused on Production Equipment
We do not plan just the building, but plan the building based on the requirements of the production line.
The layout of production equipment is the first consideration, and we design the building around it, ultimately planning a facility where the production equipment and building are well-coordinated.
Logistics Consideration
Engineers knowledgeable in logistics consider the optimal inventory quantity (warehouse planning) of raw materials and products based on the expected production volume and devise the optimal logistics plan. Additionally, we consider the building constitution with the logistics plans for employee movement, raw materials, and products.
Consideration for Product Line Changes
We consider flexible production line layouts with the possibility of frequent changes in product types.
Estimation of Costs at the Early Phase
It is possible to estimated the order of magnitude project cost (CAPEX) after the basic design phases.
Government Applications and Regulatory Compliance
Regarding the use of hazardous materials, we engage in early consultations with relevant authorities and reflect their requirements in the basic planning.
Construction Project Flow of the Production Facilities
We will explain in detail the workflow for each project phase.
Project Cases
We will introduce only the keywords. For details, please contact us.
CM Method in the Construction of Home Care Product Factories
Add a New Production Line in the Existing Home Care Product Manufacturing Factory
- Basic and detailed design for the renovation of the existing building to accommodate the addition of a new production line
- Confirmation application and fire authority consultations for the above project
- Basic planning for the relocation of the existing production line to add the new production line
- Consideration of retroactive items under the Building Standards Act for the installation of the new production line in the existing building
- Structural examination and reinforcement planning of the existing building for the above project