- Home/
- Search results for Project Management (PM)
SITE SEARCH
21〜22/22
-
Toyobeauty
Home/ Portfolio/ Projects/ Toyobeauty Cosmetics “Showcase” cosmetics factory TOYO BEAUTY CO., LTD. DATA Facility use Cosmetics factory Summary Total floor area: approx. 39,000㎡, 4 floors Location Kanzaki-shi, Saga Prefecture PREV NEXT 1 / 3 Services we provided 1.Basic design services 2.Preparation of construction quotations 3.Support services for determining the construction contractor 4.Detailed design management services 5.Additional cost assessment services 6.Construction supervision services Project flow Approx. 3 months Prepare Basic Design/ Quotations form 1 months Construction company quotation inquiry stage Approx. 4 months Review detailed design 13 months Construction phase:CM service Our contributions to the project In the basic design, we worked with the client to realize the client's concept of a "showcase cosmetics factory”. In addition to examining the flow lines and zoning of the manufacturing area, we proposed a variety of cases for considering layouts such as aisles for customer tours and presentation rooms, and worked with the client to conclude a layout. When selecting a construction contractor, we prepared a contractor comparison chart to visualize the evaluation. We supported the contractor selection by matching the evaluation criteria, such as adding up the amount that was missing from the estimate. We assessed the huge amount of additional costs submitted by the contractor, settled an acceptable price for both parties through negotiation and reduced the additional costs. During the construction phase, a construction supervisor was stationed on site to manage the schedule and quality on a daily basis, and the project was completed on schedule. We focused on designing a beautiful facade required by the client and completed the exterior to the client's satisfaction. Services related to this project Engineering, Project Management Other Projects Pharmaceuticals and Medical Devices Large-scale medical device manufacturing facility equipped with the latest logistics system Terumo Yamaguchi Corporation Pharmaceuticals and Medical Devices Manufacturing facility for bio-based...
https://cm-plus.co.jp/en/portfolio/project_details/toyobeauty/
-
Iij
Home/ Portfolio/ Projects/ Iij Data Centers System module type Data Center –Achieve short construction period and low cost Internet Initiative Japan Inc. (IIJ) DATA Facility use Data center Summary Maximum total floor space: approx. 80,000㎡ (6,000 racks) Location Shirai City, Chiba Prefecture About Client IIJ was founded in 1992 as Japan's first domestic Internet service provider, and since then has continued to take the initiative in technology as a pioneer of the Internet in Japan. Shirai Data Center Campus was built to meet the growing demand for data centers in response to the explosive growth of digital data due to 5G/IoT/AI/cloud services. PREV NEXT 1 / 3 Services we provided It is said that more than 90% of data center construction in Japan has to be done by major design firms and general construction companies. However, with CM Plus' support, IIJ was able to build its data center without relying on either of these resources. 1.FS consideration support: Compile client considerations and calculate rough budget for investment costs. 2.RFI support (Engineering Management services): Gathering information on the latest technology 3.Support for RFP/RFQ issuance (project management services): Support for document preparation for construction inquiries, conduct inquiries from multiple construction companies 4.Detailed design management (Project Management services): Implementation of regular meetings, review of design documents 5.Construction management: support for construction progress and quality control, and client completion inspections Project flow Approx. 6 months FS Approx. 3 months RFI 3 months RFP/RFQ Approx. 6 months Detailed Design Administration Approx. 9 months CM Our contributions to the project Supports architectural, electrical, and HVAC engineering resources to develop project master schedules and develop project tasks to completion dates. Supported in calculating estimated costs based on facility size assumptions. CM Plus identified the requirements for the latest DC, gathered technical proposals from relevant vendors, and conducted...
https://cm-plus.co.jp/en/portfolio/project_details/iij/