Pharmaceuticals and Medical Devices/Medium-Molecule API
Cost reduction through separate sub-contracting JITSUBO Co., Ltd.

Jitsubo

DATA

Function Peptide drug research center
Overview Total floor area approx. 700㎡ (4th floor)
Due to business expansion, it is necessary to move from an incubation facility within the university to an independent research and development center.
Location Yokohama City, Kanagawa Prefecture
  • 1 / 3

Services we provided

  • 1.Basic design
  • 2.Inquiry supporting
  • 3.Detailed design management
  • 4.Construction supervision

Project flow

  • Approx.3 months

    Basic Design/Inquiry creating

  • Approx.1 months

    Construction Inquiry

  • Approx.7 months

    Detailed Design/Construction

Our contributions to the project

  • Our contributions to the project

    At the planning stage, we figure out the detailed equipment layout basing on laboratory engineering. And we conducted construction management after the it was divided and contracted out to 4 companies separately.

  • Our contributions to the project

    We provided advice from an engineering perspective from the stage of selecting potential relocation sites.

  • Our contributions to the project

    We made careful plan of the layout of each research center/laboratory, including equipment layout. We ensured that our customer’s requirements have been fulfilled. Communication has been improved by consolidating research centers/laboratories that were previously dispersed in different places on the same floor.

  • Our contributions to the project

    At the inquiry stage, since construction of building and building equipment are contracted out separately, we summarized the total amount of estimates from each construction company within our customer’s budget.

  • Our contributions to the project

    At the detailed design stage, we cooperated with the construction companies and helped the preparation of comprehensive drawings.

  • Our contributions to the project

    During construction, we coordinated the construction schedule among construction companies through regular meetings.
    In addition, we proceeded with the project as we obtained the approval on comprehensive drawings from the user and fulfill construction supervision by ensuring all the requirements were met.