DATA
Facility use | Data center |
---|---|
Summary | Maximum total floor space: approx. 80,000㎡ (6,000 racks) |
Location | Shirai City, Chiba Prefecture |
About Client | IIJ was founded in 1992 as Japan’s first domestic Internet service provider, and since then has continued to take the initiative in technology as a pioneer of the Internet in Japan. Shirai Data Center Campus was built to meet the growing demand for data centers in response to the explosive growth of digital data due to 5G/IoT/AI/cloud services. |
Services we provided
It is said that more than 90% of data center construction in Japan has to be done by major design firms and general construction companies. However, with CM Plus’ support, IIJ was able to build its data center without relying on either of these resources.
- 1.FS consideration support: Compile client considerations and calculate rough budget for investment costs.
- 2.RFI support (Engineering Management services): Gathering information on the latest technology
- 3.Support for RFP/RFQ issuance (project management services): Support for document preparation for construction inquiries, conduct inquiries from multiple construction companies
- 4.Detailed design management (Project Management services): Implementation of regular meetings, review of design documents
- 5.Construction management: support for construction progress and quality control, and client completion inspections
Project flow
-
Approx. 6 months
FS
-
Approx. 3 months
RFI
-
3 months
RFP/RFQ
-
Approx. 6 months
Detailed Design Administration
-
Approx. 9 months
CM
Our contributions to the project
-
Supports architectural, electrical, and HVAC engineering resources to develop project master schedules and develop project tasks to completion dates. Supported in calculating estimated costs based on facility size assumptions.
-
CM Plus identified the requirements for the latest DC, gathered technical proposals from relevant vendors, and conducted a technical evaluation.
-
At the quotation inquiry stage, CM Plus evaluated the quotation and supported the drafting of the contract.
-
Held regular weekly meetings to review the design services performed by the contractor
*This project will adopt a design-build method in which the contractor will carry out detailed design and construction based on the quotation document (prepared by CM Plus). -
CM Plus confirmed the constructor’s quality control methods at each stage of construction, and witnessed inspections during the completion inspection.
Services related to this project
Other Projects
-
Pharmaceuticals and Medical Devices Large-scale medical device manufacturing facility equipped with the latest logistics system Terumo Yamaguchi Corporation
-
Pharmaceuticals and Medical Devices Manufacturing facility for bio-based Class IV implantable medical devices CoreTissue BioEngineering Inc.
-
Pharmaceuticals and Medical Devices/Medium-Molecule API Cost reduction through separate sub-contracting Jitsubo CO., LTD.
-
Pharmaceuticals and Medical Devices/Packaging Aiming to create a factory that “responds to rapidly changing customer demands and stay ahead of the competition for 15 years” Iwata Label Co., Ltd.
(currently IL Pharma Packaging Co., Ltd.) -
Cosmetics “Show” cosmetics factory Toyo Beauty Co., Ltd.
-
Pharmaceuticals and Medical Devices Large-scale medical device manufacturing facility that considers people, the community, safety, and the environment. Terumo Vietnam Co., Ltd.
-
Food/Flavor・Fragrance Smooth project execution between Asia headquarter and Japan head office Takasago International Singapore Pte. Ltd.
-
Pharmaceuticals and Medical Devices Production line reinforcement for pharmaceutical manufacturing factory Medreich Limited